Safe and Simple Installation
Modular cooling towers are delivered to the job site on step-deck trailers. In most cases, a 50 ton crane is adequate to off load the units and set them in place. Our towers feature a steel substructure that is safe to use and easy to deploy. Almost any crane and rigging contractor can set the units in place with no previous experience needed. Each tower leg rests on a support mat that helps distribute the weight of the tower module.
A lift plan is provided with all tower installations.